ARKITEK / PROJECT PORTFOLIO

Our ProjectsEngineering in practice.

Explore our work in trenchless rehabilitation, utility infrastructure, project management, BIM and integrated MEP systems.

Explore the projects
14Project entries
02Countries represented
06Project categories

SELECTED WORK

Project portfolio

From network rehabilitation to coordinated building systems.

14 projects

Diriyah Gyratory Tunnel — BIM project imageBIM

Diriyah

Diriyah Gyratory Tunnel — BIM

Steel structure modeling and coordination with MEP and architecture for the tunnel enhancement work package.

Location
Diriyah
Project scope
  • Steel structure modeling
  • MEP and architectural coordination
Diriyah Gyratory Tunnel — BIM — additional project viewDiriyah Gyratory Tunnel — BIM — additional project viewDiriyah Gyratory Tunnel — BIM — additional project view
King Salman Park Loop Mock-up Irrigation Line project imageTrenchless

Riyadh

King Salman Park Loop Mock-up Irrigation Line

Rehabilitation of a mixed GRP and HDPE irrigation line affected by localized damage and restricted access.

Location
Riyadh
Client
NESMA & Partners
Duration
2 Months
Project scope
  • CCTV review and repair access planning
  • QuickLock mechanical sleeve repairs at three damaged locations
  • Access chamber and dismantlable connection recommendations
Sports Boulevard Water Features Network project imageTrenchless

Riyadh

Sports Boulevard Water Features Network

Investigation and rehabilitation of a water features supply and return network with reported losses exceeding 100 m³/day.

Location
Riyadh
Client
Sport Boulevard Foundation & Al-Bawani
Duration
2 Months
Project scope
  • CCTV assessment of complex pipe routes and connections
  • Two access chambers providing access to four lines
  • Localized patching, CIPP lining and mechanical seals
Al Raeda Development project imageTrenchless

Jeddah

Al Raeda Development

Rehabilitation of a clay sewer network affected by groundwater infiltration, cracking and displaced joints.

Location
Jeddah
Client
MASCO / Osool
Duration
5 Months
Project scope
  • CCTV condition assessment and defect grading
  • Serial stainless steel sleeves and local CIPP lining
  • Recommendations for future access and maintenance
Wadi Qortuba Compound project imageTrenchless

Riyadh

Wadi Qortuba Compound

Water network assessment, hydraulic redesign and rehabilitation within an occupied residential compound.

Location
Riyadh
Client
Solidere
Duration
3 Months
Project scope
  • Network zoning and pipe upgrade recommendations
  • CIPP rehabilitation of selected laterals
  • VFD-controlled pumps and pressure stabilization
King Salman Airbase project imageInfrastructure

Riyadh

King Salman Airbase

Infrastructure management and delivery covering extensive wet and dry utility networks.

Location
Riyadh
Client
NAS JV
Duration
14 Months
Project scope
  • Over 40,000 m of wet utilities and 30,000 m of dry utilities
  • Surveying, alignment verification and expanded inspection planning
  • Testing and commissioning
Islamic Arts Biennale project imageInfrastructure

Jeddah

Islamic Arts Biennale

Fast-track infrastructure delivery for a major cultural event, integrating new utilities with existing networks.

Location
Jeddah
Client
Saudi Tashyid
Duration
4 Months
Project scope
  • Water, firefighting, irrigation, sewer, stormwater, power and telecom
  • Technical documentation, shop drawings and coordination models
  • Value engineering and pump room / substation coordination
CUP Building & Utilities project imageMEP

Riyadh

CUP Building & Utilities

Integrated MEP and utility infrastructure centered on a Central Utility Plant.

Location
Riyadh
Client
MBL
Duration
12 Months
Project scope
  • 30 standby generators rated at 1,280 kW each
  • 10 chillers with chilled water distribution and BMS integration
  • Wet and dry utilities, HVAC and diesel systems
World Defense Show project imageInfrastructure

Riyadh

World Defense Show

Fast-track wet and dry utilities, substations and supporting facilities for the exhibition.

Location
Riyadh
Client
Sela
Duration
12 Months
Project scope
  • 12 distribution substations plus an SEC substation
  • Two airfield lighting substations with backup systems
  • Pump room, stormwater oil interceptor and sewage facilities
Byblos Village project imageMEP

Jbeil

Byblos Village

Infrastructure and MEP delivery for a coastal development of twelve villas with rooftop pools and a shared pool.

Location
Jbeil
Client
Byblos Village
Duration
11 Months
Project scope
  • Wet and dry utilities and HVAC
  • Solar systems and fuel services
  • Pool pumping and drainage coordination
Kesrouan Medical Center project imageMEP

Beirut

Kesrouan Medical Center

Healthcare infrastructure and MEP systems supporting specialized medical spaces.

Location
Beirut
Client
KMC
Duration
13 Months
Project scope
  • MV/LV distribution, communications and wet utilities
  • Chilled water HVAC and VAV systems
  • Specialized medical rooms, boiler and sterilization systems
LIU Tripoli Campus — Architecture & Engineering project imageMEP

Tripoli

LIU Tripoli Campus — Architecture & Engineering

Infrastructure and MEP services for academic studios, laboratories and workshops.

Location
Tripoli
Client
Sukru Uzun
Duration
11 Months
Project scope
  • Wet and dry utilities with LPG and diesel systems
  • HVAC, ventilation and BMS integration
  • Design coordination, commissioning and O&M documentation

DESIGN · DELIVER · REHABILITATE

Infrastructure with maintenance in mind.

Explore the project scopes above to see how access planning, engineering coordination and rehabilitation come together.