DESIGN & BIM MODELING / LEAD PRACTICE

Model the decision. Coordinate the build.

Arkitek develops architectural, MEP and civil information as one connected system—so design intent survives coordination, procurement and construction.

THE ARKITEK DIFFERENCE

Field team carrying out pipeline inspection
FROM INFORMATION TO EXECUTION

A model is not the outcome. A clearer, coordinated and buildable project is.

We organize information around decisions: what must be approved, procured, fabricated, installed and verified.

  1. Clear decisions

    Understand what needs approval and what comes next.

  2. Coordinated information

    Connect design requirements with procurement and fabrication.

  3. Buildable outcomes

    Support installation and verification with information teams can use.

CONNECTED DISCIPLINES

One coordinated design system.

01

Architecture

Concept refinement · Envelope · Interiors · Wayfinding · Detailed design · ID drawings

02

MEP

HVAC · Plumbing · Drainage · Firefighting · Electrical · Low current · Plant coordination

03

Civil & Infrastructure

Wet utilities · Grading · Roads · Utility corridors · Chambers · External networks

04

Structural & Specialist

Steel subframes · Supports · Openings · Builder’s work · Vendor and façade interfaces

END-TO-END SCOPE

Information that moves with the project.

Each appointment is shaped around the project stage, required Level of Development and the decisions the model must support.

01

Design development

Basis of design, design criteria, calculations, layouts, material strategies and coordinated discipline decisions.

02

BIM production

Revit models from LOD 100 through LOD 500, model federation, parameter strategy, family development and information control.

03

Coordination

Clash detection, interface ownership, issue registers, workshops, constructability reviews and coordinated model sign-off.

04

Construction information

Shop drawings, plans, elevations, sections, details, schedules, quantity take-offs and model-based field support.

05

Handover

As-built model updates, asset data alignment, record drawings and structured digital deliverables for operations.

BIM DELIVERY SYSTEM

Controlled, not complicated.

01

Mobilize

BEP · CDE · coordinates

02

Build

Models · data · families

03

Federate

Interfaces · clashes

04

Resolve

Owners · actions · approvals

05

Issue

Drawings · quantities · records

CLEAR BOUNDARIES

Defined before modeling begins.

01

Inputs

Approved surveys, point clouds, IFC information, design criteria, equipment data and discipline references are recorded at mobilization.

02

Model responsibility

Model authorship, element ownership, LOD/LOI, tolerances, coordinates and approval gates are assigned in the BIM Execution Plan.

03

Interfaces

Design, delegated design, manufacturer design, temporary works and construction means and methods are identified—not left between parties.

04

Change control

Revisions are tracked against the approved baseline, with impact on coordination, drawings, quantities and programme made visible.

SECTOR EXPERIENCE

Experience across demanding environments.

REVIT · NAVISWORKS · AUTODESK CONSTRUCTION CLOUD · TEKLA · CAD / IFC / COBie

01

Transport & tunnels

02

Mixed-use & hospitality

03

Healthcare

04

Utilities & infrastructure

05

Industrial & energy

06

Public realm

BRING THE BRIEF

Let's make the next decision visible.

Discuss your design scope ↗↗